Ariston L 64 Technical Information Seite 34

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 56
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 33
34
maintenance
Important
Maintenance is an essential part of the safe and
ecient operation of the boiler and ensures its
durability. It should be performed according to the
instructions given in current legislation. Perform
combustion analysis regularly in order to check the
operating eciency of the boiler and to make sure
any polluting substances released are within the
boudaries set by current legislation.
Before beginning maintenance work:
- Disconnect the appliance from the electricity
supply by turning the external bipolar switch to
the “OFF” position;
- Remove the fuse;
- Close the gas valve and the central heating and
domestic hot water system valves.
After the work has been completed the initial settings
will be restored.
General comments
It is recommended that the following inspections be
carried out on the boiler at least once a year:
1. Check the seals in the water part and, if necessary,
replace the gaskets and restore the seal to perfect
working order.
2. Check the seals in the gas part and, if necessary,
replace the gaskets and restore the seal to
perfect working order.
3. Visually check the overall condition of the
boiler.
4. Visually check the combustion and, if necessary,
disassemble and clean the burner.
5. Following the inspection detailed in point
“3”, disassemble and clean the combustion
chamber, if necessary.
6. Following the inspection detailed in point “4”,
disassemble and clean the burner and injector,
if necessary.
7. Cleaning the primary heat exchanger
8. Make sure the following heating safety devices
are operating correctly:
- temperature limit safety device.
9. Make sure that the following gas part safety
devices are operating correctly:
- absence of gas or ame safety device
(ionisation).
10. Check the eciency of the domestic hot water
production process (test the ow rate and
temperature).
11. Perform a general inspection of the boiler
operation.
12. Remove oxide from the detection electrode
using an emery cloth.
13. After servicing, complete the relevant Service
Interval Record section of the Benchmark
Checklist located on page 54 of this manual.
14. These checks are not exhaustive. Further
mechanical, electrical and combustion
maintenance checks may be required.
Operational test
After having carried out the maintenance operations,
ll the heating circuit at a pressure of approximately
1.5 bar and release the air from the system.
Fill the domestic hot water system at the same time.
- Begin operating the boiler.
- If necessary, release the air from the heating
system again.
- Check the settings and make sure all the
command, adjustment and monitoring parts are
working correctly.
- Check the ue system is sealed and operating
correctly.
Seitenansicht 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 55 56

Kommentare zu diesen Handbüchern

Keine Kommentare