installation
Installing the Boiler
Please check that you are familiar with the
installation requirement before commencing work
(pages 7 - 13).
The installation accessories described in the
following list are included in the boiler packaging:
- Hanging bracket
- A paper template (showing the dimensions of
the boiler with 5 mm side clearances)
- Connection valves (compression)
- Washers
- Filling loop
- Installation, Servicing and Operating Instructions
- Flue gasket
Method of positioning the boiler on the wall
The paper template can be used to ensure the
correct positioning of kitchen cabinets etc.
The paper template has to be xed to the wall and
used to locate the position of the hanging bracket
and the centre for the ue hole.
Drill and plug the wall and secure the hanging
bracket using the screws provided ensure the
hanging bracket is level. Remove the boiler from its
packaging and remove the front casing panel.
Place the boiler on the hanging bracket.
N
ote: the appliaNce must Not be fitted oN a combustible
wall surface.
Connecting the boiler to the system
- Remove the boiler casing as described on page 15
- Remove the caps and connect the valves to the
boiler using the washers provided
- 4 x bre washers for the CH ow and return, cold
water inlet and hot water outlet connections
Safety Valve Discharge and Condense Outlet
The pressure relief valve pipe is made of copper. It
should terminate below the boiler safely outside
the premises. Care should be taken that it does
not terminate over an entrance or window or
where a discharge of heated water could endanger
occupants or passers by.
Warning !
Do not apply heat to the copper safety valve
outlet pipe whilst it is connected to the 3 bar
safety relief valve.
Fill the central heating and DHW system and
bleed air from the system as described in the
Commissioning instructions (page 28).
The system should be carefully checked for
leaks, as frequent relling could cause premature
system corrosion or unnecessary scaling of the
heat exchanger. The pipe from the trap should be
connected to a drain as described in the relevant
regulations.
Pay special attention not to bend the condensate
silicone drain pipe is such a way as to interrupt the
ow. Please only use drain pipe material compatible
with condensate products (refer to BS 6798:2000).
The condensate ow can reach 2 litres/hour because
of the acidity of the condensate products (Ph close
to 2), take care before operation.
See page 13 for condensate discharge options.
Note: Connections viewed from behind boiler
A
A
- remove the 2 screws A from
the transport bar
- dispose of the transport bar
and reassemble the xing
screws.
Seitenansicht 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 55 56

Kommentare zu diesen Handbüchern

Keine Kommentare